Planning law
Land-use plan or development plan in Germany: which one counts?
The binding plan is the development plan (Bebauungsplan), a municipal by-law; the land-use plan (Flächennutzungsplan) prepares it and gives no one a right to build (section 1(2) and (3) of the Building Code, BauGB). Where no development plan applies, section 34 or 35 BauGB decides (while one is being drawn up, also section 33); the land-use plan counts only in the outer area (section 35(3)), and state building rules apply as well (section 29(2)).
On this page
Two plans with different legal force
The FNP covers the whole municipality and shows, in broad outline, how land is meant to be used (section 5(1) BauGB). The B-Plan contains the legally binding rules for development (section 8(1)) and the municipality (Gemeinde) adopts it as a by-law (Satzung) (section 10(1)).
In a listing (Exposé) both may carry codes such as "W" or "WA" (section 1 BauNVO), but a B-Plan is the yardstick for every project within its boundary (section 30 BauGB). The rules on whether a project is allowed mention the FNP only in section 35, which covers the outer area: land outside the built-up part of a town and outside a qualified or project-based B-Plan.
Source: Editorial schematic based on sections 1, 5, 7, 8, 10, 30 and 35 BauGB and section 1 BauNVO; areas and template are examples, 12 November 2026
On a phone, swipe the table sideways to see every column.
| Feature | Flächennutzungsplan (FNP) | Bebauungsplan (B-Plan) |
|---|---|---|
| Area | whole municipality (s. 5(1)) | the boundary the municipality sets |
| Content | broad outline, e.g. building land, green space, forest (s. 5(2)) | legally binding rules (s. 8(1)), e.g. zone type, scale, building limits |
| Legal form | plan approved by the higher administrative authority (s. 6(1)) | municipal by-law (s. 10(1)); approval needed only in the cases of s. 10(2) |
| Takes effect | when the approval is publicly announced in the usual local way (s. 6(5)) | when publicly announced in the usual local way (s. 10(3)) |
| Expressly binds | the municipality when drawing up B-Plans (s. 8(2)); public planning bodies that took part (s. 7) | the yardstick for projects within its boundary (s. 30) |
| Role in a building application | outer area only: a public interest under s. 35(3) sentence 1 no. 1 | the project must not contradict the rules, and access must be secured (s. 30(1), (2)) |
Who the land-use plan binds
The municipality must develop its B-Plans from the FNP (section 8(2) sentence 1). Public planning bodies consulted under section 4 or 13 must adapt their own plans to it, to the extent they did not object (section 7 sentence 1).
Owners and buyers get no right to build: no one is entitled to have land-use plans or planning by-laws drawn up, not even by contract (section 1(3) sentence 2). Residential land in the FNP shows where the town wants to go; it does not schedule a B-Plan.
What a land-use plan shows
It may show building land, roads, green space, farmland, forest and more (section 5(2)). Building land appears by its general type: residential (W, Wohnbaufläche), mixed (M), commercial (G) or special-use (S) (section 1(1) of the Land Use Ordinance, BauNVO). The FNP may already show specific zone types such as WA (general residential) or MI (mixed) (section 1(2) BauNVO), but they become binding only once a B-Plan fixes them (section 1(3) BauNVO).
Building land without planned central sewage disposal must be marked (section 5(2) no. 1). The plan should also mark land that needs special structural precautions against external effects or natural forces, land above mining workings, and building land with seriously contaminated soil (section 5(3)). Designated flood areas should be copied into it for information (section 5(4a)).
Markings are a reason to ask: contaminated land and historical mining.
The development rule: from FNP to B-Plan
B-Plans must be developed from the FNP (section 8(2) sentence 1). The law allows four routes around that rule, and municipal documents use their names:
- Stand-alone B-Plan (selbständiger Bebauungsplan): no FNP is needed if the B-Plan is enough to order urban development (section 8(2) sentence 2).
- Parallel procedure (Parallelverfahren): the FNP is drawn up, amended or extended at the same time as the B-Plan. The B-Plan may be announced first if, given the state of planning, it can be assumed to be developed from the future FNP (section 8(3)).
- Early B-Plan (vorzeitiger Bebauungsplan): it may be drawn up, amended, extended or revoked before the FNP exists, but only if urgent reasons require it and it will not run counter to the intended development of the municipality; a special case is in section 8(4) sentence 2.
- Plan for development within existing built-up areas (Bebauungsplan der Innenentwicklung): in the fast-track procedure it may depart from the FNP before the FNP is amended, provided orderly urban development is not impaired; the FNP is then corrected (section 13a(2) no. 2); conditions for the fast track: section 13a(1).
Approval from the higher administrative authority is needed for a stand-alone plan, a plan announced before the FNP in the parallel procedure and an early plan (section 10(2)). It decides within one month, extendable for important reasons, as a rule to three months at most; unless refused with reasons in time, approval counts as given (section 6(4), applied accordingly).
If documents say "Parallelverfahren", ask whether the B-Plan has been announced: only then is it in force (section 10(3) sentence 4).
No development plan: when the FNP matters
Without a B-Plan, location decides. In a built-up area section 34 BauGB applies, and the FNP is not one of its tests; the project must fit in with its surroundings. See zoning and buildability check.
In the outer area section 35 applies. An ordinary project such as a family house may be allowed there only if it does not affect public interests and access is secured (section 35(2)). Public interests are affected in particular if the project contradicts the FNP (section 35(3) sentence 1 no. 1). A house on land the FNP shows as farmland or forest contradicts it, so it cannot be allowed under section 35(2) alone; exceptions are in section 35(4) and (6) and, for a limited period, section 246e (below).
Conversely, residential land in the FNP does not make an outer-area plot buildable. It removes interest no. 1 only; others remain, such as uneconomic costs for roads and utilities (no. 4), nature and the countryside (no. 5) or a scattered settlement (no. 7).
Within section 35, two exceptions concern the FNP. Certain projects under section 35(4), such as converting former farm buildings, cannot be refused for contradicting the FNP if they otherwise suit the outer area; each number has its own conditions (converting a barn). An outer-area by-law under section 35(6) may likewise shield residential projects from an FNP entry showing farmland or forest, on the conditions set out there. See building in the outer area.
Housing has a temporary special route. Until the end of 31 December 2030, a project may depart from BauGB rules only with the municipality's consent and only if the departure, weighing neighbours' interests, is compatible with public interests and serves housing as listed in nos. 1 to 3 (section 246e(1) BauGB). In the outer area it applies only to projects with a spatial link to land assessed under section 30(1), (2) or section 34 (section 246e(3)); environmental and nature-conservation requirements are in section 246e(1) sentences 2–3 and (3) sentence 2. The deadline limits when the authority can apply the rule, not how long a permit stays valid (section 246e(4)). See Bau-Turbo section 246e.
- A development plan is in forceS. 30: allowed if the project does not contradict the plan and access is secured; with a simple plan, s. 34 or s. 35 for the rest.
- A development plan is being drawn upIn addition, s. 33: allowed if all four conditions of s. 33(1) are met, or nos. 2 to 4 in the special cases of (2) and (3).
- No plan, built-up areaS. 34 with its own conditions; the land-use plan is not one of its tests.
- No plan, outer areaS. 35: a project that contradicts the land-use plan affects public interests (s. 35(3) no. 1); exceptions in (4) and (6).
Source: Editorial schematic based on sections 29, 30, 33, 34, 35 and 246e BauGB, 12 November 2026
What an FNP entry means for your plot
On a phone, swipe the table sideways to see every column.
| In the FNP | Planning situation | What follows |
|---|---|---|
| Residential (W) | B-Plan in force | The B-Plan rules apply (s. 30); with a simple plan, s. 34 or s. 35 for everything it leaves open (s. 30(3)). |
| Residential (W) | No plan, built-up area | Section 34 with all its own conditions; the FNP is not one of its tests. |
| Residential (W) | No plan, outer area | Ordinary project under s. 35(2): interest no. 1 drops out, the other interests in s. 35(3) remain. No right to a B-Plan (s. 1(3)). |
| Farmland or forest | No plan, outer area | An ordinary house (s. 35(2)) contradicts the FNP (s. 35(3) sentence 1 no. 1); exceptions under s. 35(4) or a s. 35(6) by-law, each on its own conditions; special route s. 246e (text above). |
| Residential (W) | B-Plan being drawn up | Until it takes effect, the previous situation applies; in addition s. 33, if all four conditions of s. 33(1) are met, or nos. 2 to 4 in the cases of s. 33(2) and (3). |
Whether land counts as expected building land (Bauerwartungsland) depends on concrete facts, in particular the state of planning (section 3(2) ImmoWertV); see future building land.
Finding both plans in five steps
- Identify the parcel. Take the cadastral district (Gemarkung), the cadastral section (Flur) and parcel number from the listing or cadastre (find the parcel number).
- Search online. FNPs in effect and B-Plans in force should be online, with reasons and summary statement, via a central state portal (section 6a(2), section 10a(2)). This is not a strict duty; see geoportals of the 16 states.
- Inspect at the municipality. Anyone may inspect the FNP and ask about its content (section 6(5) sentence 3); the B-Plan is kept available for anyone to inspect (section 10(3) sentence 2). Where neighbouring municipalities share one FNP (section 204), ask who keeps it.
- Ask about pending procedures. A resolution to draw up a plan is announced locally (section 2(1) sentence 2). Ask about resolutions on either plan and the stage of public consultation.
- Get it in writing. Ask the municipality to name the plans for the parcel; it tells you on request the time and cost of copies.
Listing phrases to check
- "Building land according to the FNP": neither a building permit nor a B-Plan. Ask whether a B-Plan applies or the plot lies in the built-up area.
- "Development plan in preparation": before it takes effect, section 33 allows a project only on its conditions, among them written acceptance of the future rules (section 33(1) no. 3, also required in the special cases of (2) and (3)). Nobody can promise the plan (section 1(3) sentence 2).
Binding certainty about a specific house comes only from the building authority's preliminary decision (Vorbescheid) or permit. Your notary can tie the purchase to such a result (notary process and closing).
How it looks in the report
The sample report for a plot in Brühl-Badorf, North Rhine-Westphalia, sums up its planning-law chapter on one page: no B-Plan in the state plan register at the plot, so ask the municipality.

Checklist to print
- □ FNP: note the entry for the parcel and any markings (sewage, contamination, mining, flooding)
- □ B-Plan: is one in force, which version, announced when
- □ No B-Plan: ask the building authority whether the plot is in the built-up area or the outer area
- □ Ask about resolutions to draw up or amend either plan and note the stage reached
- □ Check the listing against the plans; consider a Vorbescheid
For your parcel, the GrundCheck report lists what the state plan register holds, including development plans nearby and, where available, the land-use plan, as far as the state publishes this data; gaps are marked. It does not decide whether you may build, and it does not include the land register or the register of building encumbrances. Order a report for a parcel.
Editorial team: GrundCheck. Checked: 12 November 2026.
Official sources, accessed 12 November 2026
- Section 1 BauGB: purpose and principles of land-use planning
- Section 2 BauGB: drawing up land-use plans
- Section 5 BauGB: content of the land-use plan
- Section 6 BauGB: approval of the land-use plan
- Section 6a BauGB: summary statement and online publication
- Section 7 BauGB: adapting to the land-use plan
- Section 8 BauGB: purpose of the development plan
- Section 10 BauGB: adoption, approval and entry into force
- Section 10a BauGB: summary statement and online publication
- Section 13a BauGB: plans for development within built-up areas
- Section 29 BauGB: definition of a project
- Section 30 BauGB: projects within a development plan
- Section 33 BauGB: projects while a plan is being drawn up
- Section 34 BauGB: built-up areas
- Section 35 BauGB: outer area
- Section 204 BauGB: joint land-use plan
- Section 246e BauGB: special rule for housing
- Section 1 BauNVO: building land and zone types
- Section 3 ImmoWertV: stages of land development