Planning law
Types of development plan in Germany: qualified, simple and project-based
For the planning-law test, a qualified development plan (section 30(1) of the Building Code, BauGB) or a project-based plan (section 30(2)) means your project is allowed if it does not contradict the plan and access (Erschließung) is secured; under a simple plan (section 30(3)), whatever the plan does not cover is judged under section 34 or 35. State building regulations and other public-law rules still apply in every case (section 29(2)), and a project-based plan is also tied to one scheme, one developer and a deadline: if it is missed, the municipality is expected to revoke the plan (section 12(6)).
On this page
A listing saying "Bebauungsplan vorhanden" (development plan exists) is not enough. The kind of plan decides which planning-law test applies to your project and whether you are tied to someone else's scheme.
Three kinds of plan, three tests
The municipality (Gemeinde) draws up land-use plans on its own responsibility (section 2(1) BauGB); the development plan (Bebauungsplan) is the binding one (section 1(2)) and is adopted as a by-law, a Satzung (section 10(1)). State building regulations apply on top in every case (section 29(2) BauGB).
- Qualified plan, s. 30(1)All four minimum elements fixed. Allowed in planning law if the project does not contradict what the plan fixes and access is secured.
- Project-based plan, s. 30(2) with s. 12Allowed in planning law if the project does not contradict the plan and access is secured. Where the plan fixes a general zone: only projects in the implementation contract (s. 12(3a)).
- Simple plan, s. 30(3)At least one of the four elements missing. Its rules apply; everything else under s. 34 (built-up area) or s. 35 (outer area), each with its own conditions.
- No plan in forceNever in force, revoked or declared invalid: s. 34 or s. 35, each with its own conditions. While a plan is being drawn up, s. 33 can allow a project.
Source: Editorial schematic based on sections 12, 29 to 31 and 33 to 35 BauGB, 12 November 2026
Qualified plan: four elements as the minimum
A plan is qualified if, on its own or together with other building-law provisions, it fixes at least four things: type of use, intensity of use, buildable areas and local roads. They come from the list in section 9(1) BauGB, nos. 1, 2 and 11.
The section 34 "fits in" test does not apply here. Departures are possible as an exception the plan itself provides for, or as an exemption (section 31 BauGB). For building envelopes and plot ratios, see zoning and buildability check.
Simple plan: sections 34 or 35 fill the gaps
If even one element is missing, the plan is simple. What it fixes still binds; the rest follows section 34 in built-up areas or section 35 in the outer area (Außenbereich), under section 30(3). Take an older plan with only building lines along the street: it decides where the house stands, while in a built-up area its use depends on whether it fits in with the immediate surroundings (section 34(1)).
Outside a built-up area, section 35 governs the rest: projects that are not privileged may be approved case by case if they do not affect public interests and access is secured (section 35(2)). On built-up versus outer area, see building in the outer area.
Project-based plan: one project, a contract and a deadline
Section 12 BauGB governs the project-based plan. It applies when a developer (Vorhabenträger), such as an investor, meets all of these conditions:
- It submits a plan for the project and infrastructure agreed with the municipality, the Vorhaben- und Erschließungsplan (project and infrastructure plan).
- It is willing and able to carry it out.
- It commits to doing so within a set deadline.
- It commits to bearing the planning and infrastructure costs in full or in part.
These obligations go into the implementation contract (Durchführungsvertrag), signed before adoption. The municipality decides at its discretion whether to start the procedure (section 12(2)); nobody can claim a land-use plan, not even by contract (section 1(3)).
The project and infrastructure plan becomes part of the development plan. Within its area the municipality is not bound by the section 9 list or by the Land Use Ordinance, BauNVO (section 12(3)). If the development plan nonetheless fixes a general zone there, it must state that only projects the developer has committed to in the implementation contract are allowed (section 12(3a)).
Plots outside the project plan may be included (section 12(4)), but section 12(3) speaks of the project plan area, so for a plot at the edge ask which part it is in.
- Developer appliesstart at the municipality's discretion (s. 12(2))
- Project and infrastructure planagreed, becomes part of the plan (s. 12(3))
- Implementation contractdeadline and costs, before adoption (s. 12(1))
- Adoption and announcementthe plan takes effect (s. 10(1) and (3))
- Work within the deadlinenew developer only with consent (s. 12(5))
- Deadline missedmunicipality is expected to revoke the plan (s. 12(6))
Source: Editorial schematic based on sections 10 and 12 BauGB, 12 November 2026
Rules that do not apply inside the project area
Section 12(3) sentence 2 switches these off there (headings from the BauGB table of contents):
- Sections 14 to 18: development freezes and deferral of building applications
- Sections 22 to 28: protection of tourist areas and the municipality's pre-emption rights
- Sections 39 to 79: compensation rules and land readjustment (Umlegung)
- Sections 127 to 135c: the road and infrastructure charge (Erschließungsbeitrag) and cost refunds for nature conservation measures
There is therefore no Erschließungsbeitrag under the Building Code there; the developer bears infrastructure costs in full or in part, and the purchase contract shows whether they are in your price. Charges under state law are outside section 12; see road development charge after purchase.
If the plan fixes land for public purposes there, expropriation under section 85(1) no. 1 remains possible (sentence 3). Pre-emption rights from other laws are not affected by section 12; see pre-emption rights and approvals.
If the developer does not build: section 12(6)
If the project and infrastructure plan is not carried out within the deadline, the municipality is expected ("soll") to revoke the plan, possibly in the simplified procedure (section 13(2) BauGB). Until then the plan stays in force.
The developer cannot claim anything from the municipality because of the revocation (section 12(6) sentence 2). Afterwards another plan, section 34 or section 35 applies, so in the outer area the right to build can disappear.
A new developer needs the municipality's consent, which may be refused only if facts suggest the deadline is at risk (section 12(5)).
Buying into a project-based plan
If you buy in such an area, planning law allows what does not contradict the plan made for the scheme, not any house you choose. Building something else needs a changed or new implementation contract (section 12(3a) sentence 2) and, if the plan itself does not fit, an amendment to the plan.
Read the project and infrastructure plan with the plan documents (step 1 under "How to tell which kind of plan you have"). Then:
- Ask about the deadline and obligations. Section 10(3) does not cover the contract. Before the notary appointment, ask the municipality (Bauamt or planning office) and the seller in writing for the deadline and any amendments. In the same letter, ask the municipality when it will reply and whether it charges a fee.
- Check progress on site. Are the road and utilities built? Visit, and ask the municipality in the same letter to confirm the state of the works.
- Protect yourself in the contract. Agree with the notary, before signing, what applies if the plan is revoked or infrastructure is not built, for example a withdrawal right. See notary process and closing.
The three kinds compared
On a phone, swipe the table sideways to see every column.
| Type of plan | What it fixes | Planning-law test and obligations | Check before buying |
|---|---|---|---|
| Qualified (s. 30(1)) | At least type and intensity of use, buildable areas, local roads | Allowed if the project does not contradict what the plan fixes and access is secured | All four elements, access, any exception or exemption needed |
| Simple (s. 30(3)) | Fewer than the four minimum elements | The plan's rules, otherwise s. 34 or s. 35 | What the plan leaves open, built-up or outer area |
| Project-based (s. 30(2), s. 12) | Project and infrastructure plan as part of it, not bound by s. 9 or the BauNVO | Allowed if the project does not contradict the plan and access is secured. Developer: deadline and cost commitment in the implementation contract (s. 12(1)) | Contract deadline, progress on site, risk of revocation (s. 12(6)) |
Other labels: Angebotsplan, early plan, fast-track procedure
"Angebotsplan" (offer plan) is not a term of the Building Code; it means a plan open to any builder, so a qualified or simple one. An early plan (vorzeitiger Bebauungsplan) precedes the land-use plan (Flächennutzungsplan), allowed only for urgent reasons and if it will not stand in the way of the intended urban development (section 8(4) BauGB).
Plans for inner development, such as infill, may be drawn up in a fast-track procedure on the conditions of section 13a(1) BauGB, without an environmental assessment (section 13a(2) no. 1 with section 13(3)). The procedure does not change the kind of plan.
Section 13b no longer exists in its former form. Section 215a BauGB deals with procedures under section 13b as worded until the end of 22 June 2021 or of 31 December 2023:
- Subsections 1 and 2: procedures formally started before the end of 31 December 2022 could be completed applying section 13a, and plans already made could be brought into force in a supplementary procedure to correct errors (section 214(4) BauGB), both subject to subsection 3 and with adoption by the end of 31 December 2024.
- Subsection 3: the environmental assessment and the offsetting of harm to nature (section 13a(2) nos. 1 and 4) may be omitted only if the municipality, after a case-by-case screening, concludes that the plan is unlikely to have significant environmental effects that would have to be weighed in the planning decision or offset as harm to the appearance of the countryside or to the functioning of the natural environment. The authorities and other public bodies whose remit the plan may affect must be involved in the screening. If the procedure then continues without an environmental assessment, the municipality must announce this publicly with its main reasons.
If a plan was made under section 13b, ask the municipality whether and when it was adopted and announced again under section 215a.
Is the plan valid? Announcement and court review
A plan takes effect on its public announcement (section 10(3)). Before that, section 33 BauGB can allow a project under conditions, and a development freeze under section 14 can block one.
Within one year of the announcement, anyone who claims the plan violates their rights, and any public authority, can ask the higher administrative court (Oberverwaltungsgericht) for a review, the Normenkontrolle (section 47(1) no. 1 and (2) of the Code of Administrative Court Procedure, VwGO). An invalidity ruling binds everyone (section 47(5)).
Certain procedural, formal and weighing defects become irrelevant if nobody raises them in writing with the municipality within one year (section 215(1) BauGB). Other defects are not. If the announcement is under a year old, ask whether a review is pending.
How to tell which kind of plan you have
- Inspect the plan documents. Drawing, written provisions, explanatory statement, notice and amendments. The municipality must keep the plan and its explanatory statement open to anyone and give information on request; the notice says where (section 10(3)). Write to the Bauamt or planning office with the cadastral district (Gemarkung) and parcel number and ask whether the plan is online, when you can see it and what copies cost; times and charges come from the municipality.
- Look for the project and infrastructure plan. If it is part of the documents, the plan is project-based.
- Tick off the four elements. Type of use, intensity (plot ratio or storeys), building limits or lines, local roads. If one is missing and no other building-law provision supplies it, the plan is simple.
- Get a binding answer. File a preliminary building enquiry (Bauvoranfrage) with the building authority (Bauaufsicht); ask it beforehand for the form, fee and processing time. See building permit and pre-application.
How it looks in the report
The sample report for a plot in Brühl-Badorf, North Rhine-Westphalia, has one page on what the state register of land-use plans holds for the plot and its surroundings.

The page lists plan numbers and names, not the kind of plan; that only shows in the municipality's documents. The building authority, not the register, decides whether section 34 or section 35 applies to the plot, as the page says.
Checklist to print
- □ Tick off the four minimum elements of section 30(1) in the plan
- □ Simple plan: get written confirmation of built-up or outer area
- □ Project-based plan: read the project plan, ask for deadline and amendments
- □ Agree with the notary what applies if the plan is revoked
- □ Note the announcement date; if under a year old, ask about a court review
- □ Plan under section 13b: ask about section 215a
More checks before the notary appointment: property due diligence checklist.
For your plot, the GrundCheck report lists the development and land-use plans the state publishes in its register, with distance and source, and marks missing data. It does not confirm the kind of plan or its validity; the municipality does. The land register and the register of building encumbrances are not included. Order a report for a plot.
Editorial team: GrundCheck. Checked: 12 November 2026.
Official sources, accessed 12 November 2026
- Section 1 BauGB: purpose and principles of land-use planning
- Section 2 BauGB: drawing up land-use plans
- Section 8 BauGB: purpose of the development plan, early plan
- Section 9 BauGB: contents of the development plan
- Section 10 BauGB: adoption and entry into force
- Section 12 BauGB: project and infrastructure plan
- Section 13 BauGB: simplified procedure
- Section 13a BauGB: plans for inner development
- Section 14 BauGB: development freeze
- Section 29 BauGB: definition of a project
- Section 30 BauGB: projects within a development plan
- Section 31 BauGB: exceptions and exemptions
- Section 33 BauGB: projects while a plan is drawn up
- Section 34 BauGB: built-up areas
- Section 35 BauGB: outer area
- Section 214 BauGB: relevance of errors, supplementary procedure
- Section 215 BauGB: time limit for raising errors
- Section 215a BauGB: plans under former section 13b
- BauGB, table of contents
- Section 47 VwGO: judicial review of by-laws