Land types

Buying land on the Baltic or North Sea coast in Germany: building bans

In Mecklenburg-Vorpommern, structures may not be erected or substantially altered within 150 m landward and seaward of the coastal mean water line. Schleswig-Holstein bans erecting or substantially extending structures within at least 150 m landward of mean high water on the North Sea, the mean water line on the Baltic or the top edge of a cliff; both states allow exceptions, for example for buildings under a legally binding zoning plan.

On this page

The coastal strip: federal and state rules

Under section 61(1) of the Federal Nature Conservation Act (BNatSchG), structures may not be erected or substantially altered within at least 150 m of coastal waters in the outer area (Außenbereich, roughly land outside zoning plans and built-up villages). The distance runs from mean high water on the North Sea and from the mean water line on the Baltic. States may go further.

The official footnote to section 61 records own rules for Schleswig-Holstein, Mecklenburg-Vorpommern and Hamburg but none for Lower Saxony, so there we apply section 61. The two state acts also apply outside the outer area, subject to their exceptions (see building in the outer area).

On a phone, swipe the table sideways to see every column.

Coastal distances under federal and state law (as of 12 November 2026)
State and coastProvisionAreaRuleExceptions and conditions
Mecklenburg-Vorpommern, BalticSection 29(1) NatSchAG M-V150 m landward and seaward of the mean water lineStructures may not be erected or substantially alteredSection 29(2) and (3)
Mecklenburg-Vorpommern, BalticSection 53 LWaKüG M-Vup to 200 m landward of the mean water line, seaward in the foreshoreBuilding, substantially altering or removing must be notified; prohibited if incompatible with coastal protectionNo separate notification: conditions in s. 23(2) and s. 79(5). Work may start only 6 weeks after the complete documents arrive, unless the authority changes that period (s. 79(1))
Schleswig-Holstein, Baltic and North SeaSection 35(2) LNatSchGat least 150 m landward; North Sea from mean high water, Baltic from mean water, cliffs from the top edgeStructures may not be erected or substantially extendedSection 35(3) and (4)
Schleswig-Holstein, Baltic and North SeaSection 82(1) LWG50 m behind state dykes, 25 m behind regional dykes; dyke foreland; 150 m from a cliff edge or dune foot; coastal flood-risk areasStructures may not be erected or substantially alteredSection 82(2) and (3)
Lower Saxony, North SeaSection 61(1) BNatSchGin the outer area at least 150 m from mean high waterNo structures may be erected or substantially alteredSection 61(2) and (3)
Lower Saxony, dykesSection 16 NDG50 m from the landward edge of the dykeStructures of any kind may not be erected or substantially alteredSection 16(2) and (3)
Hamburg, Bremen–not reviewed–ask the building authority

Mecklenburg-Vorpommern: 150 m ban, 200 m notification

In Mecklenburg-Vorpommern, the nature conservation act bans erecting or substantially altering structures within 150 m landward and seaward of the mean water line (section 29(1) NatSchAG M-V).

Exceptions. Among other cases, the ban does not apply to buildings under a legally binding zoning plan, where there is a right to build in a built-up area under section 34 BauGB, or to a reasonable extension of a lawfully built farm or business (full list: section 29(2)). An exception may be granted for, among others, structures that shape the townscape, necessary structures serving only bathing, water sports or commercial fishing (full list: section 29(3)). Neither list names a private home or holiday house. Section 29 names no authority; ask the district building office (Bauamt) who decides.

Since 1 August 2026 the Water and Coastal Protection Act (LWaKüG M-V) also applies. Under section 53, building, substantially altering or removing a structure within 200 m landward of the mean water line must be notified to the water authority in good time; it prohibits work incompatible with coastal protection. No notification is needed for structures built or substantially altered in line with the provisions of a zoning plan under section 30(1) or (2) BauGB, provided the water authority took part in drawing up the plan (section 23(2)).

How notification works. Attach the documents needed to assess the project; the water authority confirms when they are complete. Work may start only six weeks after the complete documents arrive; the authority may shorten that period or extend it by up to four weeks, and may impose conditions (section 79(1)). Starting earlier can be fined up to EUR 50,000 (section 85).

If other law requires an approval, permit or notification for the project, such as a building permit, no separate notification is needed. Coastal protection is still assessed: that authority also decides under the water act, in agreement with the water authority (section 79(5)).

  • Cliffs: on cliffs secured by coastal defences and within 50 m of the top edge, digging, drilling and removing protective vegetation are among the prohibited acts (section 52(2) and (3)).
  • Coastal retreat areas (Küstenrückgangsgebiete): in designated areas behind protective dunes, new building zones and erecting or extending structures under sections 30, 33, 34 and 35 BauGB are prohibited; exemptions and exceptions: section 54(3) sentence 2 and (4). The state publishes the areas.
  • Beach and pre-emption: the beach belongs to the state, subject to rights already acquired by others (section 48(1)). Within 50 m landward of the state dykes, coastal dunes and other erosion defences listed in the act's annexes, the state has a pre-emption right if the plot is needed for flood or coastal defence (section 48(2)); see pre-emption rights.

The State Offices for Agriculture and the Environment (StALU) decide under sections 47, 51 to 53 and 54(3) and (4), with the exceptions in section 65. See buying land in Mecklenburg-Vorpommern.

Schleswig-Holstein: nature and water acts

Schleswig-Holstein expressly departs from section 61 BNatSchG. Under section 35(2) LNatSchG, at least 150 m must be kept landward on its coasts, from mean high water on the North Sea, from the mean water line on the Baltic and from the top edge on cliffs. Structures may not be erected or substantially extended there.

Exceptions. Among other cases, the ban does not apply to projects allowed by a legally binding zoning plan or a bylaw under section 34(4) sentence 1 no. 3 BauGB, or where there is a right to build in a built-up area under section 34 BauGB (further cases: section 35(3)). Exceptions may be granted, among others, for townscape-defining structures and necessary structures serving only bathing, water sports or commercial fishing (full list: section 35(4)).

The State Water Act (LWG) adds limits. Under section 82(1), structures may not be erected or substantially altered:

  • within 50 m landward of the inner toe of a state dyke (Landesschutzdeich) or 25 m of a regional dyke,
  • on the dyke foreland, even where nothing grows on it,
  • within 150 m landward of the top edge of a cliff or the seaward foot of a dune or beach ridge,
  • in coastal flood-risk areas, which the state publishes in its flood hazard and flood risk maps (section 59(1)).

Exempt are, among others, buildings under a zoning plan legally binding on 9 September 2016 (full list, with further cases for the cliff and dune strip and flood-risk areas: section 82(2)). An exception may be allowed only if it is compatible with coastal and flood protection and the ban would cause particular hardship or an urgent public interest applies; for the cliff and dune strip and flood-risk areas it is enough that those interests are not affected (section 82(3)). The permit authority decides with the building permit, in agreement with the coastal protection authority. See buying land in Schleswig-Holstein.

Lower Saxony: North Sea and dyke law

Under section 61(2), structures lawfully built or approved when the act came into force are among the exemptions. Section 61(3) provides exceptions on application.

The Lower Saxony Dyke Act adds that structures of any kind may not be erected or substantially altered within 50 m of the landward edge of a dyke (section 16(1) NDG). The dyke authority may grant a revocable exception only if the ban would cause obviously unintended hardship and dyke safety is not affected; a building permit may be issued only after that (section 16(2) and (3)).

Holiday lets and second homes

Under section 13a of the Land Use Ordinance (BauNVO), holiday flats normally count as businesses; in a general residential area they count as non-disruptive businesses, which may be allowed there only by way of exception (section 4(3) BauNVO).

Municipalities shaped mainly by tourism may introduce an approval requirement by zoning plan or bylaw (section 22(1) BauGB). It can cover, among other things, splitting a building into separately owned flats and using rooms as a second home that stands empty on more than half the days of a year; approval may be refused if this harms the area's tourist function (section 22(4)).

Before you buy: step by step

  1. Distance. Measure distances in the state geoportal and have the water or coastal protection authority (in Mecklenburg-Vorpommern the StALU) confirm the reference line; ask how long that takes.
  2. Planning status. Ask the municipality (Gemeinde) in writing whether a binding zoning plan covers the parcel (in Schleswig-Holstein: since when) or whether it lies in a built-up area.
  3. Pre-application. For building work in the strip, submit a pre-application (Bauvoranfrage) to the district building authority before buying (how it works). The authority states fees and timing. After notifying the StALU in Mecklenburg-Vorpommern, you may start only six weeks after the complete documents arrive, unless it changes that period (section 79 LWaKüG M-V).
  4. Use. Get the building permit from the seller and ask the municipality about a section 22 bylaw; the building authority decides a section 22 application, in agreement with the municipality, within one month of receiving it. If the review cannot be finished in that month, the authority may extend the deadline only by an interim notice (Zwischenbescheid) sent to you before the month runs out, by the time it needs and by three months at most. Approval is deemed granted only if it is not refused within the deadline that applies: one month, or the extended period set out in a timely interim notice (section 22(5)).
  5. Notary. In Mecklenburg-Vorpommern, tell the notary about the state's pre-emption right under section 48 LWaKüG M-V if the plot lies within 50 m behind a state dyke or dune.

Storm-surge and flood maps: flood and nature risk screening.

How it looks in the report

The sample report for a parcel in Brühl-Badorf, North Rhine-Westphalia, puts on one page how far the plot is from water, from the designated flood area and from the water protection area.

Page 49 of the Brühl-Badorf sample report: protected areas and watercourses, with distances to the Mondsee (190 m) and the nearest designated flood area (706 m)
Page "Protected areas and watercourses": nearest designated flood area 706 m away, the Mondsee lake 190 m from the boundary (OpenStreetMap, extract of 22 September 2026). Page 49 of 112 of the public sample report dated 10 November 2026 (Brühl, Badorf district, parcel 2550), page 3 of the chapter PDF. Open this page in the sample.

Distances are straight lines from the parcel boundary. The page shows no mean water line or dyke boundary and does not decide whether a coastal strip applies; the authorities above settle that.

Checklist to print

  • □ Distance to the reference line, cliff edge and dyke, confirmed by the authority
  • □ Municipality, in writing: zoning plan (since when), built-up or outer area
  • □ Mecklenburg-Vorpommern: ask the StALU about notification and the six-week waiting period (s. 79 LWaKüG M-V), coastal retreat areas and pre-emption
  • □ Schleswig-Holstein: position relative to state or regional dyke and to the coastal flood-risk area
  • □ Lower Saxony: distance to the landward dyke edge; under 50 m, ask the dyke authority

For one parcel, our report gives the distances to water, flood areas and protected areas where the state publishes the data, and flags what is missing. The authorities decide whether a coastal strip applies; the report does not include the land register or the building-encumbrance register. Check a coastal plot before you buy.

Editorial team: GrundCheck. Checked: 12 November 2026.

Official sources, accessed 12 November 2026

Common questions

Can I build within 150 m of the Baltic?

In Mecklenburg-Vorpommern, structures may not be erected or substantially altered within 150 m landward and seaward of the mean water line (section 29 NatSchAG M-V); in Schleswig-Holstein, not erected or substantially extended within at least 150 m of the mean water line, measured from the top edge on cliffs (section 35 LNatSchG). Neither ban applies to buildings under a legally binding zoning plan or where there is a right to build in a built-up area under section 34 BauGB; further exceptions are in section 29(2) and (3) NatSchAG M-V and section 35(3) and (4) LNatSchG. Mecklenburg-Vorpommern adds the notification duty within 200 m under section 53 LWaKüG M-V; work may then start only six weeks after the complete documents arrive, unless the authority changes that period (section 79(1) no. 3; cases with no separate notification: sections 23(2) and 79(5)). Schleswig-Holstein adds its water act (section 82 LWG).

Does the coastal strip affect a house that already exists?

Not the purchase itself. But substantially altering the house falls under section 29 NatSchAG M-V in Mecklenburg-Vorpommern; in Schleswig-Holstein a substantial extension falls under section 35 LNatSchG and a substantial alteration under section 82 LWG, each with the exceptions listed there. Ask for the building permit and submit planned alterations as a pre-application before you buy.

Can I let a North Sea house to holidaymakers?

That depends on the building permit and the zoning plan; under section 13a BauNVO holiday flats normally count as businesses, and in a general residential area they may be allowed only by way of exception. If the municipality has a bylaw under section 22 BauGB, splitting into separately owned flats and using rooms as a second home that stands empty on more than half the days of a year, among other things, need approval. Ask the municipality in writing.

How close to a dyke may I build?

In Schleswig-Holstein, structures may not be erected or substantially altered within 50 m landward of the inner toe of a state dyke or 25 m of a regional dyke, with exceptions under section 82(2) and (3) LWG. In Lower Saxony the same applies to structures of any kind within 50 m of the landward edge of a dyke (section 16 NDG); the dyke authority may grant a revocable exception only if the ban would cause obviously unintended hardship and dyke safety is not affected. In Mecklenburg-Vorpommern a dyke includes a protective strip of normally 3 m on each side (section 47 LWaKüG M-V).

Keep reading

Check this on your own property

The GrundCheck report organises public sources, visible risks and open professional questions for the parcel you confirm.

Check a property

Limits of this service

This service provides an automated pre-purchase check only. It does not establish ownership, title, buildability, construction permissions or service connections. It does not replace legal advice, a survey, advice from a surveyor or engineer, or tax or investment advice. Coverage is available across Germany, with data differences between state services.