Planning law

How to read a German zoning plan: symbols, use template, building envelope

On a coloured German development plan (Bebauungsplan) drawn to the federal symbols ordinance, the blue line is the building limit, the red line the building line, and “WA II 0,4” means general residential area, at most two full storeys, site coverage ratio 0.4. On 600 m² of building land, GRZ 0.4 gives 240 m² of footprint under planning law; section 19(4) BauNVO sets what garages and drives may add (up to 360 m² in the example), and state building rules also apply.

On this page

The parts of a development plan

A development plan is a municipal bylaw (section 10(1) Building Code, BauGB): a drawing, a written part where there is one, and a statement of reasons. The drawing sits on a base map meant to show the parcels and their numbers as in the land survey register (section 1(2) PlanZV).

On a phone, swipe the table sideways to see every column.

What a development plan is made of
PartWhat it containsWhat to look for
Drawing (Planzeichnung)Zones, lines, areas and use templatesThe boundary of the plan area, a grey line (annex no. 15.13 PlanZV, section 9(7) BauGB)
Legend (Zeichenerklärung)The meaning of every symbol usedHow this plan uses each symbol
Written rules (textliche Festsetzungen)Rules that cannot be drawn, such as uses that are excludedBinding together with the drawing
Notes and adopted rules (Hinweise, nachrichtliche Übernahmen)Rules from other laws, such as listed monuments under state law (section 9(6) BauGB)Meant to be labelled as such (section 2(1) PlanZV)
Statement of reasons (Begründung)Aims and effects; the environmental report is a separate part (section 2a BauGB)Why a rule reads as it does

A parcel outside the plan boundary is not covered by it. Where plans are online is shown in the comparison of state geoportals. The municipality must let anyone inspect the plan and its reasons and explain its content on request (section 10(3) BauGB).

The use template, field by field

The use template is the small grid of letters and numbers in the zones of the drawing. The fields rest on section 9(1) nos. 1 and 2 BauGB and the Land Use Ordinance (Baunutzungsverordnung, BauNVO).

On a phone, swipe the table sideways to see every column.

Fields of the use template
FieldExampleMeaningLegal basis
Type of useWA, MI, GEZone type; sections 2 to 14 BauNVO become part of the plan unless it departs from them under section 1(4) to (10)section 1(3) BauNVO
Full storeys (Vollgeschosse)II, III-V, II in a circleRoman numeral = maximum; with a hyphen, minimum and maximum; in a circle, mandatoryAnnex no. 2.7 PlanZV, section 16(4) BauNVO
Site coverage ratio (GRZ)0,4 or GRZ 0,4Share of the plot that buildings and structures may cover; GR 100 m² states a fixed area insteadNos. 2.5 and 2.6, section 19 BauNVO
Floor area ratio (GFZ)0,8 in a circle or GFZ 0,8Floor area of all full storeys per m² of plot; GF 500 m² states a fixed areaNos. 2.1 and 2.2, section 20 BauNVO
Building pattern (Bauweise)o, g, aOpen, closed (no side clearance) or as the plan defines; own symbols for detached, semi-detached or terraced houses onlyNos. 3.1 to 3.3, section 22 BauNVO
HeightTH, FH, OK, WHEaves, ridge, top or wall height above a stated reference pointNo. 2.8, section 18 BauNVO

German plans use a decimal comma: 0,4 means 0.4. What counts as a full storey depends on your state’s building code (section 20(1) BauNVO), hence “II = max. 2 VG nach LBO” in the town of Bruchsal’s reading guide.

A plan that regulates the scale of building must always set the GRZ or a fixed footprint (section 16(3) BauNVO). A template without a GFZ is not incomplete: scale may be controlled through storeys or heights.

Plan symbols and colours

The annex to the PlanZV gives each kind of content a symbol and, for coloured plans, a colour. Municipalities may add or adapt symbols (section 2(2) PlanZV), and older plans and their amendments may keep the pre-1981 and pre-1990 symbols (section 3 PlanZV).

On a phone, swipe the table sideways to see every column.

Common plan symbols and their colours
Symbol on the planColour under the PlanZVMeaningAnnex no.
Area marked WAMedium redGeneral residential area (allgemeines Wohngebiet)1.1.3
Area marked MIMedium brownMixed area (Mischgebiet)1.2.3
Area marked GEMedium greyCommercial area (Gewerbegebiet)1.3.1
LineRedBuilding line (Baulinie)3.4
LineBlueBuilding limit (Baugrenze)3.5
AreaGold ochrePublic road (Straßenverkehrsfläche)6.1
LineLight permanent greenStreet boundary line (Straßenbegrenzungslinie); omitted where it coincides with a building line or limit6.2
Outline with St or GaRedArea for parking spaces (Stellplätze) or garages (Garagen)15.3
Areasee the plan legendArea to be burdened with rights of way and utility rights (Geh-, Fahr- und Leitungsrechte)15.5
LineDark greyBoundary of the plan area15.13

Such an area on your plot is a planning rule. It does not prove that a private right of way has been created; check that in an extract from the land register (Grundbuch).

Building limit, building line and building envelope

The area where the main building may stand is called the building envelope (Baufenster), in law the buildable part of the plot, set by building lines, building limits or a building depth (section 23(1) BauNVO).

  • Building line (red): the house must be built on it. A minor step forward or back of parts of the building may be allowed, and the plan may provide further exceptions.
  • Building limit (blue): buildings and parts of buildings may not cross it. A minor projection may be allowed.
  • Building depth: measured from the actual edge of the street, unless the plan says otherwise (section 23(4)).
  • Outside the envelope, ancillary structures (section 14 BauNVO) and structures state law allows within clearances may be permitted unless the plan rules them out (section 23(5)).

Envelope and GRZ apply side by side: if the envelope fits only 200 m², that is the limit even where the GRZ allows more. State clearance rules (Abstandsflächen) apply on top; see the comparison of setback rules.

Height, roof and ridge direction

Heights appear as TH (eaves height), FH (ridge height) or OK (top edge), each in metres above a reference point such as “über Gehweg” (above the pavement) or “über NN” (above sea level), annex no. 2.8. The plan must state the reference points (section 18(1) BauNVO); on a slope, 9 m above the pavement is not 9 m above the ground.

Roof shape and pitch are not in the BauNVO. They rest on state law, which section 9(4) BauGB lets states bring into the plan; Bruchsal adopts them as local design rules (örtliche Bauvorschriften) in a separate part. A line or arrow in the envelope may fix the ridge direction, based on the positioning of buildings (section 9(1) no. 2 BauGB); the legend says what it means.

Worked example: 600 m² with GRZ 0.4 and GFZ 0.8

Take a parcel of 600 m², all of it building land behind the street boundary line; only that land counts (section 19(3) BauNVO). The template reads WA, II, GRZ 0.4, GFZ 0.8.

  1. Footprint: 600 m² × 0.4 = 240 m². That is what structures may cover (section 19(2)).
  2. Garages, drives, ancillary structures: they count, but may take the footprint up by 50% to 360 m² (ratio 0.6); the 0.8 cap (480 m²) is not reached.
  3. Floor area: 600 m² × 0.8 = 480 m², outside measurements of all full storeys (section 20(3)); two storeys of 240 m² use it up exactly.

The plan may set a different rule to the 50%, such as a lower limit (section 19(4) sentence 3 BauNVO), and further minor excesses may be allowed. Unless the plan provides otherwise, the authority may waive the limits in an individual case if the excess has only a minor effect on the natural functions of the soil, or if keeping to them would make it substantially harder to use the plot for its purpose. For covered parking spaces and garages, section 21a(3) BauNVO has its own rule, which applies only as far as section 19(4) does not stand in the way.

Balconies, loggias, terraces, ancillary structures and structures that state law allows within the clearances are left out of the floor area (section 20(4)). Habitable rooms in an attic that is not a full storey count only if the plan says so (section 20(3) sentence 2). The calculation follows the current BauNVO. Older plans may be governed by an earlier version; section 25c BauNVO, for instance, applies the earlier text to drafts put on public display before 27 January 1990. Ask the municipality which version your plan uses.

Written rules and notes

The written part may list uses that are allowed only by exception or excluded (section 1(4) to (10) BauNVO). Read it in full before concluding from “WA” what may be built; if drawing and text seem to differ, ask the municipality.

Notes and adopted rules come from other laws, such as monument or nature protection, and apply under those laws. Under planning law, a project within a qualified plan is allowed if it does not contradict the plan and access and services are secured (section 30(1) BauGB); building regulations and other laws apply as well (section 29(2) BauGB).

Reading your plan in six steps

  1. Locate the parcel. Check it lies inside the plan boundary; its number is on the cadastral map.
  2. Note the date and amendments. Ask the municipality for the publication date and any later amending plans.
  3. Read the zone and template. Watch for lines separating zones or different scales within one zone (annex no. 15.14).
  4. Measure the envelope. Use the dimensions on the lines or scale them off.
  5. Read the text and notes. Exclusions, height references, roof rules, planting duties.
  6. Ask open questions in writing. The planning office (Bauamt) tells you about any fee and reply time.

Whether your own project would be allowed, and how to get a binding answer before you buy, is covered in zoning and buildability check.

How it looks in the report

For the Brühl-Badorf sample parcel, the register read lists no development plan. The page says so and names the next step: request the plan and its reasons from the town of Brühl, including plans not online.

Page 102 of the Brühl-Badorf sample report: What you may build, with development plan under section 30, built-up area under section 34, outer area under section 35 and preliminary enquiry
Page “What you may build”: the three planning regimes, what each means for a buyer and what to do, followed by notes on the building file. Page 102 of 112 of the public sample report dated 10 November 2026 (Brühl, Badorf district, parcel 2550), page 6 of the chapter PDF. Open this page in the sample.

The report does not decode a use template.

Checklist to print

  • □ Parcel lies inside the plan boundary
  • □ Latest version, all amending plans and the legend obtained
  • □ Zone, full storeys, GRZ, GFZ and building pattern noted from the template
  • □ Footprint worked out (building land × GRZ) and the extra for garages and drives checked against section 19(4) BauNVO
  • □ Envelope compared with the intended layout
  • □ Heights with reference point, roof rules, written rules and notes read
  • □ Open questions sent to the municipality in writing

For a single parcel, the report shows whether the state register lists a development plan, along with flood areas, standard land value and other data where the state publishes them. Gaps are marked. It does not include the land register (Grundbuch) or the register of building encumbrances (Baulastenverzeichnis). Check a property before you buy.

Editorial team: GrundCheck. Checked: 12 November 2026.

Official sources, accessed 12 November 2026

Common questions

What does a number in a circle mean on the use template?

Under annex no. 2.1 of the PlanZV, a decimal in a circle is the floor area ratio (GFZ). A decimal without a circle is the site coverage ratio (GRZ). A Roman numeral in a circle, by contrast, means a mandatory number of full storeys. The legend of your plan is what counts.

On 600 m² with GRZ 0.4, may I cover more than 240 m²?

Garages, parking spaces with their drives, ancillary structures and underground structures may take the 240 m² up by as much as 50%, to 360 m², but not beyond a ratio of 0.8. This applies unless the plan says otherwise; section 19(4) BauNVO also allows further minor excesses and individual exceptions. Older plans may follow an earlier version of the BauNVO.

What is the difference between a building limit and a building line?

A house must be built on a building line (Baulinie) and may not cross a building limit (Baugrenze). In both cases a minor projection of parts of the building may be allowed, and on a building line also a minor step back (section 23(2) and (3) BauNVO).

Keep reading

Check this on your own property

The GrundCheck report organises public sources, visible risks and open professional questions for the parcel you confirm.

Check a property

Limits of this service

This service provides an automated pre-purchase check only. It does not establish ownership, title, buildability, construction permissions or service connections. It does not replace legal advice, a survey, advice from a surveyor or engineer, or tax or investment advice. Coverage is available across Germany, with data differences between state services.