Buying a plot with a house to demolish in Germany: permits and costs
In Bavaria, Baden-Württemberg and North Rhine-Westphalia you may demolish a detached house up to 7 m high (building class 1 or 3) without any procedure. Height is measured from average ground level to the floor of the top storey that could hold a habitable room. Attached or taller houses need a notice at least one month ahead in Bavaria and NRW, or a notification with a two-week wait in Baden-Württemberg. Listed buildings and conservation areas, among other cases, need a separate approval. Planning law treats the new house as a new project (sections 30 to 35 BauGB).
On this page
No procedure, notice or notification
The building codes (Landesbauordnungen) of Bavaria, Baden-Württemberg and North Rhine-Westphalia say almost the same: no procedure is needed to demolish detached buildings of building classes 1 and 3, structures that could themselves be built without a procedure, and other structures that are not buildings, up to 10 m high.
Class 1 covers detached buildings up to 7 m high with no more than two units totalling no more than 400 m², and buildings used for farming or forestry; class 3 covers other buildings up to 7 m (Art. 2(3) BayBO, section 2(4) LBO, section 2(3) BauO NRW 2018); height counts to the top habitable-room floor, not the ridge.
Other public-law rules still apply (Art. 55(2) BayBO, section 50(5) LBO, section 60(2) BauO NRW 2018).
- Detached, building class 1 or 3BY, BW, NRW: no procedure. Detached up to 7 m high, or used for farming or forestry
- Any other building in Bavarianotify the municipality and building authority at least 1 month ahead, start notice 1 week ahead
- Any other building in NRWnotify the building authority in text form at least 1 month ahead, start notice 1 week ahead
- Any other building in Baden-Württembergnotification procedure: work may start 2 weeks after complete documents arrive, unless stopped
Source: Art. 57(5) BayBO, sections 50(3) and 51(3) LBO, section 62(3) BauO NRW 2018; 12 November 2026
Semi-detached and terraced houses, and detached houses above 7 m, are not exempt. In Bavaria you notify the municipality and the building authority (Bauaufsichtsbehörde) at least one month ahead (Art. 57(5) sentence 2 BayBO), then a written start notice at least one week before work (Art. 68(6) and (8) BayBO, applied accordingly). In NRW the notice goes to the building authority in text form at least one month ahead, with a start notice one week ahead (section 74(8) applied accordingly); such a demolition may not be done as self-help or by neighbours (section 53(2)).
For an attached house, both states require a qualified structural engineer to assess and, as far as needed, prove that the neighbouring building stays stable during and after demolition, and to supervise where necessary. This does not apply where the neighbour is itself a procedure-free building.
In Baden-Württemberg these demolitions go through the notification procedure (Kenntnisgabeverfahren, section 51(3) LBO): documents go electronically to the building authority (Baurechtsbehörde), which confirms receipt of the complete set within five working days. Work may start two weeks after receipt unless the authority reports an obstacle under section 53(6) or prohibits the start (section 59(4)). Self-help and help from neighbours or friends are excluded (section 42(2)).
Other states: see the 16-state comparison.
When you need a separate approval
Listed building. In Bavaria you need permission to demolish a listed building, and also to remove a structure near one if this may affect its fabric or appearance (Art. 6(1) BayDSchG); removal at least 3 m away needs no permission (Art. 6(3) no. 4). In NRW, demolition of a listed building, and of structures close to it where this may affect its fabric or appearance, requires permission from the lower heritage authority (Untere Denkmalbehörde, section 9(1) and (2) DSchG NRW). In Baden-Württemberg, destroying or removing a protected monument needs heritage approval, applied for in writing (official procedure description, section 8 DSchG). How to check protection: monuments and archaeology.
Conservation area. Where the plot lies in an area under section 172 BauGB (Erhaltungssatzung), demolition needs approval from the municipality, or from the building authority with the municipality's consent where a building permit is required (section 173(1)). Where the area protects the townscape, approval may be refused only if the house, alone or with others, shapes the look of the town, the street or the surrounding countryside, or is otherwise of urban-design, especially historic or artistic, importance. In Baden-Württemberg it must be in place before work starts (section 59(6) LBO).
Development freeze and redevelopment area. A development freeze (Veränderungssperre) may ban removing buildings; an exception may be granted only if overriding public interests do not stand against it (section 14(1) no. 1 and (2) BauGB). In a formal redevelopment area, the same measures need the municipality's written approval (section 144(1) no. 1 BauGB), unless the redevelopment bylaw uses the simplified procedure and excludes that requirement (section 142(4) BauGB; see redevelopment areas).
Asbestos and other hazardous materials
Under the Hazardous Substances Ordinance, whoever commissions demolition is the "Veranlasser". Before work starts you must give the contractor, in writing or electronically, all information you have on present or suspected hazardous substances from the building's history, using the documents reasonably available to you (section 5a GefStoffV). That includes the year of construction, and for 1993 to 1996 the date building began, or the year if that date is not known. The duty covers private households too.
Where construction began after 31 October 1993, the contractor may as a rule assume there is no asbestos; for certain asbestos products other dates apply under Annex I no. 3.8 (section 11a(1) GefStoffV). For soil, see contaminated land.
For demolition involving asbestos, a firm needs official approval (Genehmigung) in the low- or medium-risk range, or a licence (Zulassung) of at most six years for high-risk work, which includes that approval (section 11a(4a) GefStoffV). It notifies the authority at least one week before, unless the authority waives the period in a justified case. A qualified supervisor with authority to give instructions stays on site throughout, and workers need specific training (section 11a(5)). Section 11a(1) to (5) does not apply below 1,000 fibres per cubic metre, but dust-reducing measures under Annex I no. 2.3 are still required (section 11a(6)).
Transition periods (section 25 GefStoffV): firms must prove the approval for low- and medium-risk demolition by the end of 19 December 2026 (25(9)). The expertise of the person who assesses hazards and sets protective measures, and the workers' training, must be proven by 5 December 2027 (25(5)). For work that the version of 1 January 2022 allowed without a qualified supervisor, the supervision rule applies from 5 December 2027 (25(6)). Licences granted under that old version remain valid until 5 December 2028 (25(8)). Section 25 sets no transition for the notification, the risk assessment or protective measures. Ask to see the notification and, where already required, the approval or licence.
Demolition waste: separate and document
The producer and holder of the waste, in demolition normally you as client and the contractor, must keep ten fractions apart and send them primarily for reuse or recycling: glass, plastic, metals, wood, insulation, bituminous mixtures, gypsum-based materials, concrete, bricks, and tiles and ceramics (section 8 GewAbfV). The ban on mixing hazardous waste still applies. The duty falls away where separation is technically impossible or economically unreasonable, for example with no room for containers.
Separation is documented with site plans, photos, weighbridge tickets and the receiver's statement on weight, recovery and destination, for the authority on request. No documentation is needed where no more than 10 m³ of waste arises in total.
What demolition costs
No official statistics on demolition prices are available to us. Since 1 January 2026, Freising district in Bavaria charges these official fees per tonne; small loads of certain waste under 200 kg at its transfer station pay flat fees (section 4(5), see caption):
Source: Freising district waste fee bylaw, section 4(4a) to (4d) (per-tonne rates), (5) and (7), in force since 1 January 2026
In the example, 1.5 tonnes of asbestos roof sheets and 0.3 tonnes of mineral wool cost €433.50 and €180.72 to dispose of, €614.22 in total, before removal and transport. The quantities are assumed.
Get two or three quotes on the same basis, covering:
- hazardous-materials survey, or an existing one
- asbestos work, with proof of notification and approval or licence (transition periods above)
- stripping out and separation, records handed to you
- demolition, stating whether basement, slab and foundations go
- disposal per fraction in tonnes, billed by weighbridge ticket
- for an attached house, the stability report for the neighbour
- backfilling and site set-up
Can you build a new house afterwards?
The new house is a project in its own right: sections 30 to 37 of the Federal Building Code apply to erecting buildings, and the state code and other rules apply as well (section 29 BauGB). The old house's size and position promise nothing for the new one.
Where a development plan (Bebauungsplan) exists, its provisions decide (zoning and buildability). In a built-up area without a plan, the house must fit in with its surroundings in type and scale of use, building style and the part of the plot built on, with access secured (section 34(1) BauGB). Boundary distances are state law (setback rules compared).
In the outer area (Außenbereich, open land outside towns), section 35(4) sentence 1 no. 2 BauGB favours a similar replacement house on the same spot only if the old house was lawfully built, has defects, has been used by its owner for a long time, and facts justify assuming the new one will serve the previous owner or their family. For an heir of a long-time occupant, use by the owner or family suffices. Minor enlargements and shifts are allowed. The benefit: certain objections, such as the land-use plan, cannot be raised, provided the project otherwise suits the outer area. Settle with a preliminary enquiry (Bauvoranfrage) before purchase whether the authority accepts these conditions for a buyer; see building in the outer area.
From purchase contract to building application
On a phone, swipe the table sideways to see every column.
| Document | What it shows | Where from | When |
|---|---|---|---|
| Building file (Bauakte), year of construction | year built, whether approved; basis for the firm's information (section 5a GefStoffV) | seller | before buying |
| Written answer on heritage protection | whether demolition needs heritage permission | heritage authority (Denkmalbehörde) | before signing |
| Written answer on bylaws | whether a conservation bylaw (section 172 BauGB), redevelopment area (section 144) or development freeze (section 14) requires approval | municipality (Gemeinde) | before signing |
| Preliminary enquiry (Bauvoranfrage) | the authority's planning-law view of the new house, in the outer area also section 35(4) | building authority | before buying |
| Hazardous-materials survey (Schadstofferkundung) | hazardous materials and quantities for quotes and disposal | expert; before ownership passes only with the seller's consent | before quotes |
- Before the notary appointment (seller, municipality, heritage authority): request the first four documents above.
- Hazardous-materials survey (expert): agree access in the contract, then request quotes.
- Notice or notification (state authority): periods above. Heritage and bylaw approvals, which must be in place before work, and the firm's asbestos notification run in parallel.
- Demolition: waste separated, records kept.
- Building application (building authority): prepare in parallel.
How it looks in the report
In the sample report for a parcel in Brühl-Badorf, one map shows the house on the plot: an aerial photo, the parcel boundary and the buildings from ALKIS, the official cadastre. Below it: footprint (116 m²), number of buildings (two) and recorded use (residential land), all from ALKIS.

The page itself notes that the footprint is the outline in the cadastre and that later extensions may be missing. Whether the house was approved is in the building file, which the report does not contain; demolition planning needs measurements on site.
Checklist to print
- □ Building class and height checked
- □ Written answers on listing and bylaws, preliminary enquiry filed
- □ Year built and known hazards given to the firm in writing
- □ Asbestos notification seen, plus approval or licence where section 25 GefStoffV already requires it
- □ Notice or notification filed in time
- □ Waste records agreed in the contract
Before you buy, the report shows a parcel's building in the cadastre, the development plan and other data where the state publishes them, and marks gaps. It excludes the building file, the land register and the register of building encumbrances. Check a plot before you buy.
Editorial team: GrundCheck. Checked: 12 November 2026.
Official sources, accessed 12 November 2026
- Art. 2 BayBO: definitions, building classes
- Art. 55 BayBO: general rule
- Art. 57 BayBO: procedure-free projects, demolition
- Art. 68 BayBO: building permit and start of work
- Art. 6 BayDSchG: works on listed buildings
- Baden-Württemberg building code (LBO), version of 16 March 2026 (sections 2, 42, 50, 51, 53, 59)
- City of Heidelberg, procedure description: heritage approval (section 8 DSchG BW)
- North Rhine-Westphalia building code 2018, version from 1 September 2026 (sections 2, 53, 60, 62, 74)
- North Rhine-Westphalia heritage act, version from 1 September 2026 (section 9)
- Section 14 BauGB: development freeze
- Section 29 BauGB: definition of project
- Section 34 BauGB: built-up areas
- Section 35 BauGB: outer area
- Section 144 BauGB: approvals in redevelopment areas
- Section 172 BauGB: conservation of buildings
- Section 173 BauGB: approval
- Section 5a GefStoffV: duties of the client
- Section 11a GefStoffV: work with asbestos
- Section 25 GefStoffV: transitional provisions
- Section 8 GewAbfV: construction and demolition waste
- Freising district waste fee bylaw, official gazette 17 November 2025, in force from 1 January 2026