Building permit

Buying a plot with a building permit in Germany: what passes to you

In Bavaria, Baden-Württemberg and North Rhine-Westphalia a building permit passes to you when you buy the plot: the law there says it binds successors. Its clock, however, has been running since it was issued, not since your purchase: if work has not started, it lapses after 4 years in Bavaria (unless the permit says otherwise) and after 3 years in Baden-Württemberg and NRW, and it covers only the approved plans.

On this page

Does the permit pass to you as buyer?

Yes, in all three states covered here. Bavaria goes furthest: under Art. 54(2) sentence 3 BayBO, permits and preliminary decisions also bind anyone who acquired a right of possession after they were issued. You therefore do not need a new permit just because the plot changes hands. But you take the permit as it stands, with its conditions and with whatever part of its validity has already run.

The person carrying out the project is called the Bauherr, and a change must be reported. Bavaria's Art. 50(1) sentence 5 BayBO requires the new Bauherr to tell the building authority without undue delay and in text form (letter or email); section 53(1) BauO NRW 2018 says the same, and section 42(6) LBO in Baden-Württemberg requires notice without prescribing a form. In NRW, failing to report is an administrative offence (section 86(1) no. 7).

NRW also deals with the paperwork: the Bauherr and later owners must keep the permit, the approved plans and the structural documents and pass them on to any successor (section 74(9) BauO NRW 2018). How an application works is covered in building permit and pre-application, using Brandenburg as the example; decision times are in how long a building permit takes.

How long the permit lasts in three states

The period runs from the issue date printed on the permit, not from your notary appointment. Example: a permit issued on 15 March 2024 for a house on which no work has started. In Baden-Württemberg and NRW, building must start by March 2027; in Bavaria by March 2028, unless the permit sets a different period. Buying in November 2026, you would have about four months in Baden-Württemberg or NRW in this example, unless the permit is extended.

On a phone, swipe the table sideways to see every column.

Validity under state law, as of 12 November 2026
BavariaBaden-WürttembergNorth Rhine-Westphalia
Permit lapses ifwork has not started within 4 years of issue or has stopped for 4 years, unless the permit sets another period (Art. 69(1))work has not started within 3 years of issue or then stops for 1 year (section 62(1) LBO)work has not started within 3 years of issue or stops for more than 1 year (section 75(1))
Extensionon written application, up to 4 years each timeon application in electronic text form, up to 3 years each timeon application in text form, up to 1 year each time
Backdated extensionpossible if the application arrived before the period endedpossible if the application arrived before the period endedpossible if the application arrived before the period ended
Legal challengesuspends the period until the permit can no longer be challengedno rule in section 62no rule in section 75
Preliminary decision valid for4 years unless it sets another period; extensions of up to 4 years each (Art. 71)3 years; section 62(1) and (2) apply accordingly, so extensions of up to 3 years each (section 57 LBO)3 years; extensions of up to 1 year each (section 77(1))

The Bauherr applies for the extension to the building authority (in Baden-Württemberg the Baurechtsbehörde). If the deadline falls before ownership passes to you, the seller, as the current Bauherr, will normally have to apply, so the contract should oblige them to. The authority sets the fee under the state's fee rules; ask about the amount and processing time before you apply.

Can you build your own design under it?

No. The permit covers the project as shown in the plans bearing the approval stamp (Art. 68(3) BayBO, section 58(1) LBO, section 74(4) BauO NRW 2018). Altering a structure also requires a permit as a rule (Art. 55(1) BayBO). If construction departs from the approved plans, the authority may order work to stop (Art. 75(1) BayBO, section 64(1) LBO, section 81(1) BauO NRW 2018).

For Bavaria, the Bavarian Chamber of Architects describes two routes. An amendment permit (Tekturgenehmigung) is a new permit that changes the content of the existing one, and is meant for minor changes to the same project. If key features such as location, footprint, floor area, volume, use, height, roof shape or appearance change so much that it becomes a different project, a new, stand-alone permit is needed. A Memmingen checklist shows what an authority asks for: a formal application quoting the file number, every affected plan redrawn with the changes marked in colour, and the neighbours involved under Art. 66 BayBO.

The plans were usually drawn by the seller's architect. Works of architecture and their designs, as well as plans and drawings, are among the works protected by the Copyright Act (section 2(1) nos. 4 and 7 UrhG) if they are personal intellectual creations. If you want to build exactly the approved house, settle before you buy whether you may use the plans and whether the architect will continue for you.

Preliminary decision: what it binds

A Vorbescheid answers specific questions about a project before the full application (Art. 71 BayBO, section 57 LBO, section 77 BauO NRW 2018). It also binds you as the buyer, and you can rely on it: Bavaria names preliminary decisions expressly in Art. 54(2) sentence 3, and Baden-Württemberg and NRW apply their successor rule to them accordingly. What you acquire is the answer to the questions asked, for example on the type of use or the buildable area, not a building permit. Read the questions and answers word for word and compare them with your design.

Permit exemption: what you are really buying

Within a binding development plan (Bebauungsplan), a house may be built without a permit in Bavaria (Art. 58 BayBO) and NRW (section 63 BauO NRW 2018) only if every condition of those provisions is met, among them: it is not a special building (Sonderbau), it complies with the plan and local building bylaws, access and services are secured, and the municipality neither asks for a permit procedure nor applies for a temporary ban. Baden-Württemberg's equivalent is the notification procedure, with its conditions in section 51 LBO; building may start two weeks after the complete documents reach the authority, unless it is prohibited or the owner receives a notice under section 59(4) LBO.

No decision confirming that the house is lawful is issued. NRW states expressly that neither the municipality nor the building authority has a duty to check (section 63(3) sentence 3). The rules must still be met (Art. 55(2) BayBO, section 51(4) LBO). In this case you buy a set of documents and a filing date, not an approval.

A time limit applies here too. In NRW the right to build lapses if work has not started three years after the conditions were met or stops for more than a year (section 63(3) sentence 6). In Bavaria, the procedure must be repeated if building is to start more than four years after it became permissible (Art. 58(2) sentence 7 BayBO). For a notification in Baden-Württemberg, ask the Baurechtsbehörde whether old documents can still be used.

Neighbours: when the permit is safe from challenge

A neighbour's objection or lawsuit does not stop work: third-party challenges to a building approval have no suspensive effect (section 212a(1) Federal Building Code, BauGB). The court can still set the permit aside in those proceedings. A lawsuit must be filed within one month of service of the objection decision or, where no objection stage applies, of notice of the permit (section 74(1) Code of Administrative Court Procedure, VwGO). If the notice of available remedies was missing or wrong, the period is as a rule one year (section 58(2) VwGO).

So ask the building authority which neighbours were served with the permit and whether any challenge is pending. In Bavaria a challenge also moves the expiry date, because it suspends the validity period until the permit is final (Art. 69(1) BayBO).

What to have on the table before the notary appointment

  1. Ask for the permit and the stamped plans (from the seller, before any reservation): the decision with its date and conditions, all plans bearing the approval stamp and any extension or amendment decision.
  2. Inspect the building file (Bauakte) at the lower building authority, with the owner's written authority: check that the copies match, and whether amendments or challenges are on file. The authority tells you the appointment, timing and fee on request.
  3. Work out the expiry date (as soon as you have the permit): issue date plus the state's period plus any extensions. If it falls before your planned start, the extension application must reach the authority before expiry.
  4. Add clauses to the contract (the notary sends a draft; for a consumer contract, that is a business seller selling to you as a consumer, it should as a rule reach you two weeks before signing, section 17(2a) Notarisation Act, BeurkG): handover of all documents, the seller's statement on extensions, amendments and known neighbour objections, and the right to use the plans. See notary process and closing.
  5. Report the change of Bauherr to the building authority without undue delay once you take over, in text form in Bavaria and NRW.

How it looks in the report

The sample report for a parcel in Brühl-Badorf has an appendix page listing open points and the office responsible for each. In the row for the Baulastenverzeichnis (register of building encumbrances) it asks "Are there any Baulasten? Is the house approved?", notes that the building file can be inspected with written authority, and names Stadt Brühl's building authority.

Page 108 of the Brühl-Badorf sample report: table of open points with subject, information needed and responsible office, including the register of building encumbrances and the building file at the building authority
Appendix page "Open points and contacts": each question with the office that can answer it with authority. Page 108 of 112 of the public sample report dated 10 November 2026 (Brühl, Badorf district, parcel 2550), page 2 of the chapter PDF. Open this page in the sample.

The building file and the Baulastenverzeichnis are not part of the report. The page shows whom to ask; only the building authority can confirm whether a permit exists for a plot.

Checklist to print

  • □ Copy of the permit with its issue date and all stamped plans received
  • □ Expiry date worked out under the state's rules, including extensions
  • □ If time is short: extension applied for before expiry (by the seller while they are still the Bauherr)
  • □ Building file inspected, service on neighbours and any challenges checked
  • □ Checked whether your design matches the approved plans or needs a new application
  • □ Right to use the plans and handover of documents written into the contract
  • □ After the purchase: change of Bauherr reported to the authority

Before you buy, the report sets out the development plan, flood areas and other data for a parcel where the state publishes them, and marks what is missing. It does not include the building file, the land register or the register of building encumbrances. Check a plot before you buy.

Editorial team: GrundCheck. Checked: 12 November 2026.

Official sources, accessed 12 November 2026

Common questions

Do I need a new permit as the buyer?

Not because of the change of owner. In Bavaria (Art. 54(2) sentence 3 BayBO), Baden-Württemberg (section 58(2) LBO) and NRW (section 58(4) BauO NRW 2018) the permit binds successors. A different design does need a new application; in Bavaria, smaller changes to the same project can go through an amendment application (Tektur).

When does the validity period start?

On the date the permit was issued, not on your purchase. If work has not started, it lapses after 4 years in Bavaria unless the permit sets another period, and after 3 years in Baden-Württemberg and NRW. It may be extended only on an application that reaches the authority before the period ends.

Do I have to tell the authority that I have taken over?

Yes. The new Bauherr must notify the building authority without undue delay, in text form in Bavaria (Art. 50(1) sentence 5 BayBO) and NRW (section 53(1) BauO NRW 2018), and under section 42(6) LBO in Baden-Württemberg.

Is a permit exemption the same as a permit?

No. No decision on lawfulness is issued, and the rules must still be met. In NRW the right to build lapses three years after it arose if work has not started, or after an interruption of more than a year; in Bavaria the procedure must be repeated after more than four years. See the section on permit exemption.

Keep reading

Check this on your own property

The GrundCheck report organises public sources, visible risks and open professional questions for the parcel you confirm.

Check a property

Limits of this service

This service provides an automated pre-purchase check only. It does not establish ownership, title, buildability, construction permissions or service connections. It does not replace legal advice, a survey, advice from a surveyor or engineer, or tax or investment advice. Coverage is available across Germany, with data differences between state services.